Building Project
- Design Updates
- Project Plan
- Needs
- Financial Investment
- Fact Sheet
- Referendum Planning Process
- Frequently Asked Questions
- Contact Us
Design Updates
Project Plan
Preliminary Concept Plan
This concept plan has been updated multiple times based on feedback from our stakeholders.
It is important to remember that there may be revisions to the plan during the construction phase.

For more information, email questions to dmikula@sshore.k12.wi.us
The 2026-27 building project will include the following:
- Renovate the existing building to improve organization by creating "neighborhoods" where all grade levels are grouped together.
- Incorporate flexible spaces for small group instruction and individualized learning, enhancing the educational environment.
- Create a central core area for student common spaces, fostering a sense of community, and collaboration among students.
- Expand parking and reconfigure bus routes to streamline traffic patterns and keep kids safer upon entry and exits.
- Add a secure front entrance, community fitness room, and classrooms to adapt to the modern security and space needs of students and staff.
Needs
Our original high school was constructed in 1977 and the elementary was added in 1990. Within the last 49 years, the elementary addition was the only major investment.
FAILING BUILDING SYSTEMS
- Many of the building systems are original to the 1977 building. These major building systems have significantly outlived their useful life, do not run properly, are not energy efficient, and are at a risk of failure.
SAFETY CONCERNS
-
Poorly configured pick-up/drop-off areas create congestion and pedestrian safety issues.
-
The main entrance needs modification to better control visitor access.
-
Security cameras and the emergency communication system are outdated.
-
Some areas of the building do not comply with current ADA standards.
-
The building's location at the base of a hill causes drainage issues and flooding
-
The current fitness room is located on the upper-level and presents challenges including lack of accessibility, poor air quality, and difficulties in effective supervision
SPACE CONSTRAINTS
-
The current building layout lacks flexible spaces for today’s education needs, like breakout areas for small group instruction and individualized learning.
-
Some rooms are used as classrooms despite not originally being designed for that purpose, leading to inadequately sized spaces.
-
Reorganization of space has forced the separation of grade levels, disrupting continuity and collaboration among students and staff.
-
Not all classrooms have access to natural light.


Financial Investment
Estimated Total Project Cost: $17,750,000
The facility improvements cannot be addressed within the annual operating budget. Therefore, the District has borrowed money for the building project and contributed a portion of the its Fund Balance.
Amount Contributed from Fund Balance: $3,000,000
Amount Borrowed: $14,750,000 (approved by referendum in Nov 2024)
Fact Sheet
Referendum Planning Process

Background: Beginning, in 2021, a Long-Range Planning Committee was established and tasked with identifying the current state and needs of the district. In 2022, the Board unanimously approved the Strategic Plan which included a set of Belief Statements, an updated district Mission Statement, Vision Statement, and four goals to work on over the next five years. Goal #3 reads, "By 2026, our current and future space needs will be met."
key Facts:
-
South Shore School District employs over 40 staff members who serve approximately 200 students ages pre-school through 12th grade.
-
Enrollment has increased by over 20% in the last three years.
-
The original high school building was constructed in 1977. The elementary school addition was added in 1990. Within the last 48 years, there has been only one renovation completed.
-
Over the past 3 years, multiple in-depth professional assessments have been completed on the structural integrity of the building as well as the space needs for current and future enrollment. The major findings and suggested course of action are outlined below.
-
A community wide survey was sent out in April of 2024 to elicit feedback on education priorities, facility needs, financial support and school district satisfaction
SURVEY RESULTS:
Through a community-wide survey, 76% of parents/staff and 57% of non-parent/non-staff respondents indicated support for a capital referendum to address facility needs. Respondents prioritized building system, ADA accessibility, and safety and security updates.
Frequently Asked Questions
Frequently Asked Questions
- Q: WHAT IS THE PURPOSE OF THE REFERENDUM?
- Q: WHAT IS INCLUDED IN THIS PROJECT?
- Q: WHY IS THE DISTRICT DOING THIS NOW?
- Q: WHAT WAS THE FACILITIES FOCUS GROUP?
- Q: WHAT DID THE COMMUNITY SURVEY FEEDBACK INDICATE?
- Q: THE SURVEY ASKED FOR FEEDBACK ON OVER $23 MILLION OF NEEDS. HOW DID THE DISTRICT DECIDE ON A $14.75 MILLION REFERENDUM SOLUTION?
- Q: WILL THE FITNESS CENTER BE OPEN TO THE COMMUNITY?
- Q: WHAT IS THE TAX IMPACT OF THE REFERENDUM?
- Q: WHAT IS “FUND BALANCE” AND WHY ARE WE USING IT TO REDUCE BORROWING FOR THE PROJECT?
- Q: MY PROPERTY IS GETTING ASSESSED. WHAT DOES THAT MEAN FOR MY SCHOOL TAXES?
- Q: IF THE REFERENDUM PASSES, HOW WILL THE SPACES BE DESIGNED?
- Q: WHEN WILL THE SPACES BE COMPLETE?
- Q: HOW CAN I LEARN MORE?
- Q: WHY IS FAIR MARKET VALUE OR EQUALIZED VALUE USED TO DETERMINE TAX IMPACT?
Q: WHAT IS THE PURPOSE OF THE REFERENDUM?
Q: WHAT IS INCLUDED IN THIS PROJECT?
The referendum project includes updates to heating, ventilation, and electrical systems; improvements to accessibility and safety; and updated learning environments with the addition of classroom, secure entrance and community fitness center. This plan includes renovations that will improve building organization by creating grade-level neighborhoods, ensuring that all grade levels are grouped in the same area. Modification to the parking area will address traffic concerns by expanding parking and separating bus traffic from vehicles. Additionally, drainage issues will be addressed through grading and landscaping.
Q: WHY IS THE DISTRICT DOING THIS NOW?
In 2021, the South Shore School District formed a Long-Range Planning Committee to evaluate the district’s current and future needs. One of the district's primary goals is to address space requirements by 2026. The school buildings - constructed in 1977 and 1990 - have only undergone renovation once in the last 48 years. Following professional assessments and extensive community input, it became clear that critical updates are needed to maintain and improve the facilities. The district is committed to addressing the most urgent needs based on feedback from a Facilities Focus Group, staff, students and over 300 community members who participated in a community-wide survey.
Q: WHAT WAS THE FACILITIES FOCUS GROUP?
The Facilities Focus Group consisted of over 30 community stakeholders who dedicated time to understand the facility needs and evaluate possible solutions for the district. Over the course of four meetings, the group reviewed building assessments, focusing on critical issues such as outdated and failing mechanical systems, safety concerns, and the need for modern learning spaces. Key priorities identified included upgrading the heating, ventilation, and electrical systems; addressing ADA compliance and safety; and creating flexible classroom environments. The Facilities Focus Group also emphasized the importance of the school as a community hub, proposing spaces like a community fitness center and expanded areas for collaboration and engagement.
Q: WHAT DID THE COMMUNITY SURVEY FEEDBACK INDICATE?
A survey sent to the community received 306 total - a response rate of 25.6% which is a strong response (15-17% is typical).
76% of parents and staff were in favor of $19.5 million referendum to fund facility improvements, and 57% of non-parents/non-staff were also supportive. Key priorities identified included upgrading the heating, ventilation, and electrical systems; addressing ADA compliance; and safety and security enhancements. Questions about a performing arts center and renovating the track received slightly less than 50% support overall so these were not included in the final project.
Apart from the building project, respondents were asked to rate the District in the following areas: delivering a high-quality education, keeping the public informed, managing funds appropriately, and building pride in the community. Our community pride and support achieved the highest rating ever seen by School Perceptions, the company that organized the survey effort. All other areas were in the 90th percentile among districts they've worked with.
Q: THE SURVEY ASKED FOR FEEDBACK ON OVER $23 MILLION OF NEEDS. HOW DID THE DISTRICT DECIDE ON A $14.75 MILLION REFERENDUM SOLUTION?
The community-wide survey asked residents for feedback on projects totaling $23.5 million. After analyzing survey results and having discussions with the Facilities Focus Group and staff, the district reduced the project scope and budget to focus on the most urgent needs. This reduced the referendum amount by 35%, bringing it to $14.5 million. This reduction was achieved through the removal of certain project elements including childcare facilities, additional classrooms, and a scaled-down building addition. It also reflects the $3 million contribution from the District's fund balance, which reduced the need for borrowing.
Q: WILL THE FITNESS CENTER BE OPEN TO THE COMMUNITY?
Q: WHAT IS THE TAX IMPACT OF THE REFERENDUM?
Q: WHAT IS “FUND BALANCE” AND WHY ARE WE USING IT TO REDUCE BORROWING FOR THE PROJECT?
"Fund balance" is the amount of reserve, or savings, that the district has accumulated over many years of budget surpluses (when annual revenues exceed expenses). It is important for a school district to build and maintain an adequate fund balance. Schools receive their operating revenues in large inflows at specific intervals throughout the year. School expenses are paid evenly throughout the year. An adequate fund balance allows a district to manage the mismatch in timing. Fund balance is also a safeguard against unforeseen changes in revenues or expenses. A healthy fund balance should represent at least 25% of annual expenses. The district has been able to build its fund balance over time to $6.4 million representing over 100% of expenses.
The school district intends to invest $3 million of its general fund balance into the project. This investment will reduce the total amount borrowed and, consequently, reduce burden of the referendum for taxpayers while still maintaining a fund balance above 50% of expenses.
Q: MY PROPERTY IS GETTING ASSESSED. WHAT DOES THAT MEAN FOR MY SCHOOL TAXES?
If your property is being reassessed, it means that the local assessor is adjusting the assessed values of the properties in your municipality to reflect current market conditions. The process is intended to bring the assessment in-line with the Fair Market or Equalized value of your property. This process is necessary to ensure fair distribution of tax burden.
Think of the school district’s tax revenue as a pie. The size of the pie stays the same. When properties are reassessed, the size of each slice changes based on the new property values. If your property value increases more than others in the district, your slice of the pie gets bigger, and you'll pay more in taxes. If your property value increases less or decreases, your slice may shrink, meaning you could pay less. The total pie—the amount the district collects—doesn’t change, but your reassessment affects the size of your slice.
Q: IF THE REFERENDUM PASSES, HOW WILL THE SPACES BE DESIGNED?
The design process will be highly collaborative, involving discussions with all stakeholders. The design phase is expected to last around 9 months prior to construction, with several iterations of planning discussions to refine the design. The process will also include input from staff, students, and the community to ensure the project aligns with the needs and expectations of all users. Building tours of similar facilities will help inform design choices, and detailed programming will be conducted for each individual space. To help visualize the spaces, renderings and 3D models will be created during the design phase.
Q: WHEN WILL THE SPACES BE COMPLETE?
Design has been underway for several months involving a highly collaborative process with all stakeholders including district staff and students, an architectural firm, and the general contractor. Construction will be phased over 17 months starting in June 2026 with completion anticipated by the end of summer 2027. We have worked with our design and construction partners to strategically phase construction in a way that minimizes disruption and maintains our primary focus of educating students. For the most up-to-date schedule see the Project Plan tab at the top of the page.
Q: HOW CAN I LEARN MORE?
For more information, please call the District Office at 715-774-3500, or email Dani Mikula, District Superintendent, at dmikula@sshore.k12.wi.us.
Q: WHY IS FAIR MARKET VALUE OR EQUALIZED VALUE USED TO DETERMINE TAX IMPACT?
"Fair market value" is the estimated value of a specific property if it were sold on the market. Property assessments determine fair market value. They are determined by the individual local municipality and will vary by municipality.
"Equalized value" in a school district is determined by the state and represents the combined total value of all taxable property within the district. Equalized value is used for fair tax distribution to ensure that all property owners, regardless of location, are taxed equitably based on the actual value of their property. This approach helps create a more consistent and fair tax system across the district or region. In Wisconsin, schools are required by law to use fair market value, which is clearly indicated on your tax bill.